H, the wire-resistant cable carriage of the corner tower should be installed pre-biased device, the rising tower should be set up the line carriage, to avoid wire job-hopping.
h. The paying off pulley of tension angle tower shall be equipped with pre deflection device, and the wire pressing pulley shall be set at the rising tower position to avoid wire jumping.