NOTES:1. Nitrogen usages for Synthesis Area includes usages for batch transfer, through sparger etc.2. For Dryer Area, only maximum makeup of nitrogen is shown. This includes initial estimate for total makeup to the flake drying system. Flake drying system vendor to estimate and confirm the actual nitrogen makeup.3. Compounding Area total Nitrogen usages are estimates only. To be finalized during detailed engineering based on selected vendor information.4. N2 facility to be designed based on total N2 design flow rate of 6500 kg/hr. Continuous design flow rate is estimated to be 3500 kg/hr. Design flow rates are with margin and estimates only. To be finalized during Detailed Engineering by LEC based on Vendor information.