By no means shall any works such as cutting and punching of cladding and parapet be carried out at site. Any penetration holes into cladding for piping, cabling etc., shall be cut or punched at the fabrication shop. The cut or punched surfaces of the coated metal edges shall be coated by using the same or equivalent color materials so as to prevent corrosion of the base metal.