Traditional quotation mode is based on budget price (mandatory price). This pricing mode is based on the same amount, the same drawing, the same construction scheme and the same technical specification. Therefore, the consumption and price of labor, materials and machinery are static comparison, which is the comparison of the accuracy of engineering cost calculation and can not really reflect the bidder's<br>
正在翻译中..