9.1.5.2 The Buyer shall be responsible for:<br>9.1.5.2.1 Construction of equipment foundations, cable grooves, construction of pits, trench covers and platforms.<br>9.1.5.2.2 Installation site preparation, under the guidance of the seller responsible for the discharge of equipment, in place.<br>9.1.5.2.3 The Buyer, under the guidance of the Seller's technical staff, assists the seller in the installation and commissioning. Buyer personnel shall be subject to the seller's guidance to the installation and commissioning personnel.<br>9.1.5.2.4 The Buyer installs the main cable between the grid and the furnace switch cabinet and connects the lines of natural gas, cooling water and compressed air to the heat treatment furnace, where the seller is responsible for connecting the various work points from the interface to the equipment.<br>9.1.5.2.6 Is responsible for providing auxiliary materials, such as test parts and quenching media, for commissioning and production.<br>9.1.5.2.7 Is responsible for the removal of the remaining construction materials and the clean-up of the construction site.<br>9.1.5.2.8 Is responsible for the installation of the main smoke pipe.
正在翻译中..