The roof is based on the requirements of the contract to find the slope at 3% of the building, and it is agreed to indicate the surface layer line; the details of the roof steps are T0107-06.
The roof is sloped according to 3% of the building according to the contract requirements, and the surface course line is agreed to be indicated; see t0107-06 for details of steps out of the roof.<br>