沉设套管 根据设计图纸、地勘报告及探摸情况,沉设套管,套管下沉过程中应控制套管垂直度,沉管下端需打设至-17.1m 标高。在塑料排水板沉设过程中,打设人员应现场捋顺排水板,避免排水板出现扭曲现象。提升套管 确定排水板已达到设计深度后,可提起套管,此时应观察套管插入孔,如排水板相对套管不动,则说明排水板回带,继续上提套管,直到排水板移动抽入套管,量取此时套管的提升高度,即为排水板回带量。排水板施工过程中如出现回带现象,应分析回带产生的原因并采取措施解决。剪断排水板当提升至底部离开土面 50cm 时,人工从套管底部切断排水板,使排水板外露长度控 制在 50cm 以上。检查验收 检查排水板回带长度是否满足规范要求,若满足,填写塑料排水板施工记录,移位至下一板位进行施工,若不满足,在距该板位 30cm 处重新打设排水板,重复以上施工步骤。 并逐根、如实做好施工记录,每日施工结束后汇总签字确认。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Immersion tube <br>according to the design drawing, and exploration report Tanmo case, immersion sleeve, the sleeve should be controlled during the sinking of the vertical sleeve, the lower end of the immersed tube -17.1m level required to play set. During the sinking process of the plastic drainage board, the setting personnel should push the drainage board on site to avoid distortion of the drainage board. <br>Lifting sleeve <br>determining the drainage board design depth has been reached, the sleeve can be lifted at this time should be observed that the cannula is inserted into the hole, such as the drain does not move relative to the sleeve, then the back plate with the drainage, the sleeve is further lifted until the drainage The board is moved into the casing, and the lifting height of the casing at this time is measured, which is the amount of the drainage board returning. If the phenomenon of reentry occurs during the construction of the drainage board, the cause of the reentry should be analyzed and measures should be taken to solve it. When the <br><br>drainage plate is cut <br>to 50cm away from the soil surface at the bottom, manually cut the drainage plate from the bottom of the casing to control the exposed length of the drainage plate above 50cm. <br><br>Inspection and acceptance <br>check back with drainage board meets specifications length, if yes, fill plastic drainage plate construction records, the plate is shifted to the next place for the construction, not satisfied, at 30cm from the plate at the position of the drain plate on again, Repeat the above construction steps. And make the construction records one by one and truthfully, and sign and confirm after the daily construction.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Sink the casing <br>According to the design drawings, geo-survey report and exploration situation, the casing, casing subsidence process should control the verticality of the casing, the lower end of the sink pipe should be set to -17.1m elevation. In the process of the plastic drainage plate sinking, the staff should be on-site smooth inge drainage plate, to avoid the phenomenon of distortion of the drainboard.<br>Lifting casing <br>After determining that the drainage plate has reached the design depth, the casing can be lifted, at this time should observe the casing insertion hole, such as the drainboard relative to the casing does not move, then the drainboard backband, continue to lift the casing, until the drainboard moved into the casing, measure the lifting height of the casing at this time, that is, the drainboard back band volume. In the course of drainage plate construction, if the phenomenon of tempering occurs, the causeof the belt should be analyzed and measures should be taken to solve it.<br><br>Cut off the drain board<br>When the lift is raised to the bottom to leave the surface 50cm, the drainboard is manually cut off from the bottom of the casing, so that the drain board exposed length is controlled at more than 50cm.<br><br>Check acceptance <br>Check whether the length of the drainage plate backband meets the specification requirements, if satisfied, fill in the plastic drainage board construction record, shift to the next plate for construction, if not satisfied, from the plate 30cm to re-set the drainboard, repeat the above construction steps. And root by root, truthfully do a good job of construction records, daily after the completion of the construction summary signature confirmation.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Casing sinking<br>According to the design drawings, geological exploration reports and exploration conditions, the casing shall be sunk. During the process of casing sinking, the verticality of the casing shall be controlled. The lower end of the sunk pipe shall be drilled to the elevation of -17.1m. In the process of setting the plastic drain board, the laying personnel shall smooth the drain board on site to avoid distortion of the drain board.<br>Lifting sleeve<br>After confirming that the drainage plate has reached the design depth, the casing can be lifted. At this time, the casing insertion hole shall be observed. If the drainage plate does not move with respect to the casing, it means that the drainage plate returns and continues to lift the casing until the drainage plate moves into the casing. Measure the lifting height of the casing at this time, which is the return amount of the drainage plate. In case of return belt phenomenon during the construction of drainage board, the causes of return belt shall be analyzed and measures shall be taken to solve it.<br>Cut off the drain board<br>When lifting to the bottom 50 cm away from the soil surface, manually cut off the drain plate from the bottom of the casing, so that the exposed length of the drain plate is controlled over 50 cm.<br>Inspection and acceptance<br>Check whether the return length of the drainage board meets the specification requirements. If it meets the requirements, fill in the construction record of the plastic drainage board and move it to the next board position for construction. If it does not meet the requirements, re lay the drainage board at the place 30cm away from the board position and repeat the above construction steps. The construction records shall be made one by one and truthfully, and shall be summarized and signed for confirmation after the completion of construction every day.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: