Sink the casing <br>According to the design drawings, geo-survey report and exploration situation, the casing, casing subsidence process should control the verticality of the casing, the lower end of the sink pipe should be set to -17.1m elevation. In the process of the plastic drainage plate sinking, the staff should be on-site smooth inge drainage plate, to avoid the phenomenon of distortion of the drainboard.<br>Lifting casing <br>After determining that the drainage plate has reached the design depth, the casing can be lifted, at this time should observe the casing insertion hole, such as the drainboard relative to the casing does not move, then the drainboard backband, continue to lift the casing, until the drainboard moved into the casing, measure the lifting height of the casing at this time, that is, the drainboard back band volume. In the course of drainage plate construction, if the phenomenon of tempering occurs, the causeof the belt should be analyzed and measures should be taken to solve it.<br><br>Cut off the drain board<br>When the lift is raised to the bottom to leave the surface 50cm, the drainboard is manually cut off from the bottom of the casing, so that the drain board exposed length is controlled at more than 50cm.<br><br>Check acceptance <br>Check whether the length of the drainage plate backband meets the specification requirements, if satisfied, fill in the plastic drainage board construction record, shift to the next plate for construction, if not satisfied, from the plate 30cm to re-set the drainboard, repeat the above construction steps. And root by root, truthfully do a good job of construction records, daily after the completion of the construction summary signature confirmation.
正在翻译中..