Temporary power lines on site are planned in a unified manner in accordance with the layout of the temporary power use plan, and the three-phase five-wire system and the grounding protection system determined by the plan are strictly used for wiring. There are obvious signs at the place of buried cables, and corresponding protection should be provided on the line and road. Measures
正在翻译中..