R & D is required to immediately determine the integrated supply with the procurement<br>Temporary restructuring by the supplier before formal product change<br>Before formal product change, R & D shall determine the temporary positioning point, which shall be controlled by assembly<br>R & D provides temporary measures, temporary assembly control<br>R & D provides temporary measures, temporary assembly control<br>
正在翻译中..