2. Beam, plate construction<br>1. Beam ribs are usually tied up after the beam bottom mold is well tied, tied after unsure and then side mold support, for the cross-section is not high (≤500) secondary beam can not be affected by this, the beam can be tied up, tied and then the beam ribs fall. When the beam vertical rebar adopts the upper and lower two layers, can be used in two layers between the pads with a diameter of 25mm of rebar, in order to maintain the rowing of the upper and lower rebar, the main secondary beam junction should be in accordance with the design requirements of the addition of lifting ribs and hoop encryption, the joints of the hoops should be staggered on both sides of the beam, the joint position should meet the design requirements and staggered with each other.<br>3. The ribs should be constructed after the beam ribs are tied, and the specifications of the design requirements are crossed on the template before the tie-up. The hook of the bottom rebar should be facing up, and the hook of the upper steel bar should be facing down and anchored in the beam. For double-layered ribs, foot support should be added between the upper and lower ribs to ensure the spacing of the two-layer ribs.<br>4. At the intersection of beams, plates and columns, often the rebar is denser, the concrete pouring is difficult, the amount of the concrete should be tied to create conditions for concrete pouring, so that the bar spacing at least 30mm spacing, the beam plate is tied, should prevent the water wire pipe pre-buried when the rebar is raised or pressed down, before concrete pouring according to the requirements of the pad block.
正在翻译中..