Material hoist is provided <br>according to the project site, and in consideration of the body, the fitting stage two or more monomers (comprising two) are used SS100 / 100 as a vertical type material hoist transport device, a total station configuration Vientiane material lifter 4, the ABP It was arranged 3 sets of material hoist, material hoist arrangement see site plan.
正在翻译中..