In the method, for the moment processing elements and between the information elements; for the information heuristic factor, representing the relative importance of the trajectory; for the expectation heuristic factor, to represent the relative importance of the heuristic factor; for the heuristic function, to represent the processing elements from the desired degree of transfer to the desired degree, for the inverter of the rate of change of manufacturing resources; for the ants at the current moment from the processing elements optional processing meta-node collection. At the initial moment, the default is that the information of each path is equivalent, set .
正在翻译中..