1.08 Work with facework to one side and to both sides are each so described. Facework is any work finished fair. 1.09 Work bonded at back to other work (i.e. either existing work or work of a differing material) is so described. 1.10 Projections which are horizontal and raking are each so described. 1.11 Curved work is so described. 1.12 Walls, isolated piers and isolated casings are given in square metres measured on the centre line of the material. No deduction is made for voids not exceeding 0.10 m2. Deductions for lintels, sills, and the like are measured as regards height to the extent only of the full block or brick courses displaced, and as regards depth to the extent only of the full block or brick thickness displaced. 1.13 Projections are given in metres. 1.14 Rates for measured work are deemed to include the costs of: mortar for bedding and jointing, type of bond and method of pointing, raking out joints or leaving rough joints to form key, battering work (i.e. sloping with parallel sides), extra materials for curved work, tapering work and for work bonded at back to other work, building against or tying to other work (i.e. not bonded), including extra materials, temporary strutting to work used as formwork, cast-in-situ reinforced concrete horizontal and lateral supports required for walls including reinforcement and formwork, cast-in-situ reinforced concrete lintels and surrounds to openings including reinforcement and formwork
1.08 Work with facework to one side and to both sides are each so described. Facework is any work finished fair. 1.09 Work bonded at back to other work (i.e. either existing work or work of a differing material) is so described. 1.10 Projections which are horizontal and raking are each so described. 1.11 Curved work is so described. 1.12 Walls, isolated piers and isolated casings are given in square metres measured on the centre line of the material. No deduction is made for voids not exceeding 0.10 m2. Deductions for lintels, sills, and the like are measured as regards height to the extent only of the full block or brick courses displaced, and as regards depth to the extent only of the full block or brick thickness displaced. 1.13 Projections are given in metres. 1.14 Rates for measured work are deemed to include the costs of: mortar for bedding and jointing, type of bond and method of pointing, raking out joints or leaving rough joints to form key, battering work (i.e. sloping with parallel sides), extra materials for curved work, tapering work and for work bonded at back to other work, building against or tying to other work (i.e. not bonded), including extra materials, temporary strutting to work used as formwork, cast-in-situ reinforced concrete horizontal and lateral supports required for walls including reinforcement and formwork, cast-in-situ reinforced concrete lintels and surrounds to openings including reinforcement and formwork
正在翻译中..