After the tower foundation reaches the specified strength, it should be verified whether the size of the embedded bolts in the foundation meets the design and specification requirements, and the columns should be checked to meet the quality requirements and transported to the vicinity of the foundation. <br>The swing rope should be tied 400mm below the hanging rope and no more than 800mm from the top of the column.
正在翻译中..