Construction and Demolition waste will arise from a number of activities to be carried out by the contractor during establishment and operation of the fill bank and the Construction and Demolition Material Sorting Facilit. It may include wood from formwork, equipment and vehicle maintenance parts, materials and equipment wrappings, and Construction and Demolition waste sorted out from the incoming public fill. Subject to the agreement of Environmental Protection Department, this Construction and Demolition waste can be transported to the adjacent SENT Landfill as a designated outlet. Therefore, waste generated by the fill bank will not have major impact to the surrounding environment.The fill bank is for the temporary stockpiling of public fill and, thus, there will not be any storage and transportation of hazardous materials or handling of spoil materials including potentially contaminated materials. The inert Construction and Demolition materials generated at the establishment stage and the public fill received during the operation of the fill bank can be stored up for subsequent reuse in other reclamation and earth filling projects. This will prevent the materials from being disposed of in landfills and occupying valuable landfill space.
Construction and Demolition waste will arise from a number of activities to be carried out by the contractor during establishment and operation of the fill bank and the Construction and Demolition Material Sorting Facilit. It may include wood from formwork, equipment and vehicle maintenance parts, materials and equipment wrappings, and Construction and Demolition waste sorted out from the incoming public fill. Subject to the agreement of Environmental Protection Department, this Construction and Demolition waste can be transported to the adjacent SENT Landfill as a designated outlet. Therefore, waste generated by the fill bank will not have major impact to the surrounding environment.<br>The fill bank is for the temporary stockpiling of public fill and, thus, there will not be any storage and transportation of hazardous materials or handling of spoil materials including potentially contaminated materials. The inert Construction and Demolition materials generated at the establishment stage and the public fill received during the operation of the fill bank can be stored up for subsequent reuse in other reclamation and earth filling projects. This will prevent the materials from being disposed of in landfills and occupying valuable landfill space.
正在翻译中..