Care should be taken to protect light steel dragon bones and cover triggers when installing various pipelines in the ceiling. The booms and dragon bones of light steel dragon bones are not allowed to be fixed to ventilation ducts and other equipment. Light steel skeleton, cover trigger and other ceiling materials in the entrance, storage, use process should be strictly managed to ensure that no deformation, no moisture, no rust. The doors and windows installed at the construction site, the finished walls, floors, window sills, etc. should pay attention to protect against pollution. The installed light steel dragon bone shall not be trampled on, and the pendants of other types of work shall not be suspended on the light steel dragon bone. In order to protect the finished product, cover trigger installation must be in the shed pipe insulation, water testing and other processes after all acceptance.