1. The type, model and performance of the coating used in the coating engineering shall meet the design requirements.Inspection method: check product qualification certificate, performance test report and mobilization acceptance record.2. The color and pattern of coating engineering shall meet the design requirements.Test method: observation.3. The coating works shall be evenly painted and firmly bonded, and shall not be missed, bottomed, peeled or powdered.Inspection method: observation; hand touch inspection.4. The base course putty of coating works shall be flat, solid and firm without pulverization, peeling and cracks.Inspection method: observation; hand touch inspection; inspection of construction records.4、 Finished product protection measures1 organization and management of finished product protection1.1 in the preparation stage, the project construction leader shall coordinate the construction with the civil engineering, installation and subcontractor. Reasonably arrange the working procedure, strengthen the cooperation of work types, correctly divide the construction sections, and avoid the damage of finished products due to improper working procedure or cooperation of work types. 1.2 establish finished product protection responsibility system, assign special personnel to be responsible for supervision and management of finished product protection. 1.3 strengthen the quality and finished product protection education of employees and the pre job education of finished product protectors, establish the cooperation and protection awareness of workers, establish various temporary protection handover systems, and do a good job in each process with someone in charge. 2 protection of finished products during construction2.1 in the process of coating construction, the site shall be cleaned after the completion of the work, and the scattered coating that pollutes the doors, windows and glass shall be cleaned in time. 2.2 carefully consider the sequence of painting to avoid cross contamination. Timely clean up the construction waste and lime soil accumulated on the facade, and do not clean up after the paint is brushed to cause pollution. 3 Protection of finished decoration products3.1 it is not allowed to write, knock or scratch on the finished decoration products. 3.2 avoid colliding with walls and corners during operation. 3.3 it is strictly prohibited to make fire and splash water on the construction site to prevent wall peeling and mildew. 3.4 construction is prohibited in rainy days. 3.5 cover and protect doors and windows during wall painting and coating construction3.6 the exterior wall decoration shall be constructed in rainy days as far as possible, and the newly painted exterior wall coating shall be covered with rainproof cloth on the top of the wall in case of rain.
1. The type, model and performance of the coating used in the coating engineering shall meet the design requirements.<br>Inspection method: check product qualification certificate, performance test report and mobilization acceptance record.<br>2. The color and pattern of coating engineering shall meet the design requirements.<br>Test method: observation.<br>3. The coating works shall be evenly painted and firmly bonded, and shall not be missed, bottomed, peeled or powdered.<br>Inspection method: observation; hand touch inspection.<br>4. The base course putty of coating works shall be flat, solid and firm without pulverization, peeling and cracks.<br>Inspection method: observation; hand touch inspection; inspection of construction records.<br>4、 Finished product protection measures<br>1 organization and management of finished product protection<br>1.1 in the preparation stage, the project construction leader shall coordinate the construction with the civil engineering, installation and subcontractor. Reasonably arrange the working procedure, strengthen the cooperation of work types, correctly divide the construction sections, and avoid the damage of finished products due to improper working procedure or cooperation of work types. <br>1.2 establish finished product protection responsibility system, assign special personnel to be responsible for supervision and management of finished product protection. <br>1.3 strengthen the quality and finished product protection education of employees and the pre job education of finished product protectors, establish the cooperation and protection awareness of workers, establish various temporary protection handover systems, and do a good job in each process with someone in charge. <br>2 protection of finished products during construction<br>2.1 in the process of coating construction, the site shall be cleaned after the completion of the work, and the scattered coating that pollutes the doors, windows and glass shall be cleaned in time. <br>2.2 carefully consider the sequence of painting to avoid cross contamination. Timely clean up the construction waste and lime soil accumulated on the facade, and do not clean up after the paint is brushed to cause pollution. <br>3 Protection of finished decoration products<br>3.1 it is not allowed to write, knock or scratch on the finished decoration products. <br>3.2 avoid colliding with walls and corners during operation. <br>3.3 it is strictly prohibited to make fire and splash water on the construction site to prevent wall peeling and mildew. <br>3.4 construction is prohibited in rainy days. <br>3.5 cover and protect doors and windows during wall painting and coating construction<br>3.6 the exterior wall decoration shall be constructed in rainy days as far as possible, and the newly painted exterior wall coating shall be covered with rainproof cloth on the top of the wall in case of rain.
正在翻译中..
1. The type, model and performance of the coating used in the coating engineering shall meet the design requirements.<br>Inspection method: check product qualification certificate, performance test report and mobilization acceptance record.<br>2. The color and pattern of coating engineering shall meet the design requirements.<br>Test method: observation.<br>3. The coating works shall be evenly painted and firmly bonded, and shall not be missed, bottomed, peeled or powdered.<br>Inspection method: observation; hand touch inspection.<br>4. The base course putty of coating works shall be flat, solid and firm without pulverization, peeling and cracks.<br>Inspection method: observation; hand touch inspection; inspection of construction records.<br>4、 Finished product protection measures<br>1 organization and management of finished product protection<br>1.1 in the preparation stage, the project construction leader shall coordinate the construction with the civil engineering, installation and subcontractor. Reasonably arrange the working procedure, strengthen the cooperation of work types, correctly divide the construction sections, and avoid the damage of finished products due to improper working procedure or cooperation of work types. <br>1.2 establish finished product protection responsibility system, assign special personnel to be responsible for supervision and management of finished product protection. <br>1.3 strengthen the quality and finished product protection education of employees and the pre job education of finished product protectors, establish the cooperation and protection awareness of workers, establish various temporary protection handover systems, and do a good job in each process with someone in charge. <br>2 protection of finished products during construction<br>2.1 in the process of coating construction, the site shall be cleaned after the completion of the work, and the scattered coating that pollutes the doors, windows and glass shall be cleaned in time. <br>2.2 carefully consider the sequence of painting to avoid cross contamination. Timely clean up the construction waste and lime soil accumulated on the facade, and do not clean up after the paint is brushed to cause pollution. <br>3 Protection of finished decoration products<br>3.1 it is not allowed to write, knock or scratch on the finished decoration products. <br>3.2 avoid colliding with walls and corners during operation. <br>3.3 it is strictly prohibited to make fire and splash water on the construction site to prevent wall peeling and mildew. <br>3.4 construction is prohibited in rainy days. <br>3.5 cover and protect doors and windows during wall painting and coating construction<br>3.6 the exterior wall decoration shall be constructed in rainy days as far as possible, and the newly painted exterior wall coating shall be covered with rainproof cloth on the top of the wall in case of rain.
正在翻译中..