Construction site waste: it can be divided into unused concrete, old concrete, mortar and other mineral materials produced by the removal of construction debris, plastering, etc., as well as wood, paper, metal and other waste materials that are not used in the remaining concrete projects. The waste materials are stacked in a unified manner, and a dedicated person is assigned for removal and disposal. And the classified stacking should meet the following requirements:
正在翻译中..