质量保证措施密封沟采用机械辅以人工挖沟,开挖时保证断面尺寸,切断透水层。把压膜沟区的砂、粉土全部清理干净,并运到加固区外存放。为保证泥浆密封的英语翻译

质量保证措施密封沟采用机械辅以人工挖沟,开挖时保证断面尺寸,切断透水层

质量保证措施密封沟采用机械辅以人工挖沟,开挖时保证断面尺寸,切断透水层。把压膜沟区的砂、粉土全部清理干净,并运到加固区外存放。为保证泥浆密封墙的密封效果,采取如下措施: 1、 密封泥浆采用低渗透性的粘土制作;2、 适当掺入一定量的膨润土;3、 施工时严格按照操作规程施工,保证打设深度、间距,不漏打。4、 真空预压完成后,密封沟进行开挖、翻晒,并换填。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Quality assurance measures The <br>sealing trench is mechanically supplemented by manual trenching, to ensure the cross-sectional size during excavation, and cut off the permeable layer. All sand and silt in the gully area are cleaned and transported outside the reinforced area for storage. <br>To ensure the sealing effect of sealing the slurry wall, take the following measures: <br>1, sealing slurries of clay with low permeability; <br>2, incorporated in a suitable amount of bentonite; <br>3, construction in strict accordance with the rules of construction, to ensure that the driven depth, Spacing, no miss. <br>4. After the vacuum preloading is completed, the sealing ditch will be excavated, overturned and replaced.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Quality assurance measures<br>Sealing ditches are mechanically supplemented by manual trenching, which is made to ensure the size of the section and cut off the permeable layer. Clean up all the sand and powder in the membrane trench area and transport it to the reinforcement area for storage.<br>In order to ensure the sealing effect of the mud sealing wall, the following measures are taken: <br>1, sealed mud using low permeability clay production;<br>2, appropriately mixed into a certain amount of bentonite;<br>3, construction in strict accordance with the operating procedures of the construction, to ensure that the depth, spacing, do not miss.<br>4, vacuum pre-pressure is completed, sealing the trench for excavation, re-basking, and filling.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Quality assurance measures<br>Mechanical excavation and manual excavation shall be adopted for the sealing ditch to ensure the section size and cut off the permeable layer. Clean up the sand and silt in the film pressing ditch area and transport them to the outside of the reinforcement area for storage.<br>In order to ensure the sealing effect of slurry seal wall, the following measures are taken:<br>1. The sealing mud is made of clay with low permeability;<br>2. Appropriate addition of bentonite;<br>3. The construction shall be carried out in strict accordance with the operating procedures to ensure that the depth and spacing of the drilling are not missed.<br>4. After the completion of vacuum preloading, the sealed trench shall be excavated, turned over and replaced.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.