Construction vibration personnel before construction to go through strict professional training, clear vibration layered impact thickness, vibration force duration and layered vibration strength standards. The vibration bar should be inserted quickly and slowly, the distance distance between the vibration bar and other shock points should be in accordance with the relevant technical regulations, and the distribution of the shock points should be uniform division. The vibration time is required by concrete not significantly sinking, no bubbles coming out, and surface slurry.
正在翻译中..