Anti explosion structural measures of anti explosion wall: 1. Structural columns are set every 2 ~ 3M along the wall length, and 2 ∅ 10 reinforcement is set every 500mm along the wall height to tie with the bearing wall or structural column, and the tie reinforcement runs through the whole plant along the wall. 2. Concrete ring beam shall be set about 2 ~ 3M along the height direction of the wall, and the ring beam shall be connected with the bearing wall or structural column.<br>
正在翻译中..