Interior line production beat 2 minutes 30 seconds, inspection beat average 2 minutes 40 seconds, main line production beat 5 minutes, inspection beat average 4 minutes, affected by capacity increase, self-test problem record and repair pull, production and quality door inspection cross-operation, line repair and other issues
正在翻译中..