3) The seismic fortification intensity of the site is 7 degrees, the designed basic seismic acceleration value is 0.15, the designed seismic group is the first group, the building site category is category 2, the characteristic period is 0.35s, and the building site belongs to the general seismic section of the building.
正在翻译中..