Connect the DUT to the power supply. The load circuits shall be in operation. For test duration, the specification of the appropriate part of ISO 8820, Road vehicles --Fuse-links (operating time rating) shall be used, considering the upper tolerance plus 10%. If protection other than fuses is used (e.g. electronic protection), the test duration shall be agreed between manufacturer and user.