1) Through vacuum pre-pressure, pre-load pre-load pre-load at the site, gradually solidified, so that the foundation soil in advance occurred most of the settlement, the late overall settlement can be controlled;<br>2) Simulate the load distribution under the condition of use, so that the ground soil is not evenly settled when it settles in advance, and the uneven settlement can be controlled in the late period after the construction of the floor;<br>3) Using the load of filling or covering water load, and vacuum to form a joint pre-pressure, relative to the later additional load to form an overload pre-pressure, further improve the additional load when the foundation treatment, as much as possible to improve the construction subsidence, so that the treatment of the post-soil and the use of load conditions to form an over-solid body, further reduce the use of the conditions of work after settlement.<br>4) After the vacuum pre-pressure is finished, the filling backfill, and the whole area 4 to 5 times layered impact crushing, so that the shallow soil filling further compact, the strength further improved, thereby improving the base carrying capacity and soil stiffness.
正在翻译中..