The waste in construction and life is placed centrally and disposed of in time or transported to a place agreed by the supervision engineer and the local environmental protection department, and if it can not be disposed of or removed in time, it is concealed to prevent loss. If the waste material is toxic, seal off the permanent waste disposal approved by the supervision engineer and the environmental protection department to prevent contamination of surface water. The raw materials in the mixing yard and the materials temporarily stacked in the construction site should be classified and stacked Strengthen the management of road-building materials transport vehicles, loose materials are not allowed to be higher than the top of the container; When transporting materials that are easy to fly, cover them with dust-proof soil, and store loose and easy to fly materials where they are located; Clean up the construction site in time, arrange special personnel, special sprinkler to strengthen the cleaning and maintenance of the required machine ploughing road and construction sidewalk, mix with sprinkling water when carrying out embankment construction in dry season, so as to ensure that the material has a certain humidity and avoid dust.in an orderly manner. The steel bars, tools, machinery and equipment at the construction site should be arranged neatly.
The waste in construction and life is placed centrally and disposed of in time or transported to a place agreed by the supervision engineer and the local environmental protection department, and if it can not be disposed of or removed in time, it is concealed to prevent loss. If the waste material is toxic, seal off the permanent waste disposal approved by the supervision engineer and the environmental protection department to prevent contamination of surface water. The raw materials in the mixing yard and the materials temporarily stacked in the construction site should be classified and stacked Strengthen the management of road-building materials transport vehicles, loose materials are not allowed to be higher than the top of the container; When transporting materials that are easy to fly, cover them with dust-proof soil, and store loose and easy to fly materials where they are located; Clean up the construction site in time, arrange special personnel, special sprinkler to strengthen the cleaning and maintenance of the required machine ploughing road and construction sidewalk, mix with sprinkling water when carrying out embankment construction in dry season, so as to ensure that the material has a certain humidity and avoid dust.<br>in an orderly manner. The steel bars, tools, machinery and equipment at the construction site should be arranged neatly.
正在翻译中..