卡箍生产1. 取作业指导书放在工具桌前,确认模具状况;2. 领取合格模具到机台边;3. 领取材料并置于上料机构;4. 开启电源开关,并设定成的英语翻译

卡箍生产1. 取作业指导书放在工具桌前,确认模具状况;2. 领取合格模

卡箍生产1. 取作业指导书放在工具桌前,确认模具状况;2. 领取合格模具到机台边;3. 领取材料并置于上料机构;4. 开启电源开关,并设定成型速度(频率),调节定长螺杆定好送料长度并锁紧螺杆;5. 模具装上机器固定,材料引入模具内;(每盘材料去除料头0.8-1.2米)6. 点动调试料模、切断刀、成型刀、点动全过程生产零件,自检合格;7. 开启自动成型开关试生产100个零件,分别做首件三检和热处理检验;8. 批量生产,用周转箱接装零件至规定重量并抚平零件,搬至托盘上,堆放限高五层;
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Production clamp <br>1. Take the operating instructions on the tool table, confirm status mold; <br>2. the mold to receive a passing machine edge; <br>3. disposed to receive material and feeding mechanism; <br>4. Turn on the power switch, and setting the molding speed (frequency), the fixed length adjusting screw will be good and the locking screw feed length; <br>5. stationary mold mounted on the machine, the material is introduced into a mold; (per plate feed material removal head 0.8-1.2 m) <br>6. debugging jog feed mode, cutting knives, molding knives, jog whole process of production of parts, self-qualified; <br>7. turn on the automatic production of molded test switch parts 100, respectively, to make the first heat treatment and III test specimen; <br>8. mass, with tipping part totes to heal and predetermined parts by weight, moved the pallet, stacked five high limit;
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Clamp production<br>1. Take the work instructions and put it at the tool table to confirm the mold condition;<br>2. Pick qualified mold to the machine side;<br>3. Collect ingress materials and place them in the materials agency;<br>4. Turn on the power switch, set the molding speed (frequency), adjust the length of the fixed screw to determine the feed length and lock the screw;<br>5. The mold is machine-fixed and the material is introduced into the mold; (0.8-1.2 m per plate of material removal head)<br>6. Point-on commissioning material mold, cut-off knife, molding knife, tap the whole process of production parts, self-test qualified;<br>7. Turn on the automatic molding switch test production of 100 parts, respectively, to do the first three inspection and heat treatment inspection;<br>8. Mass production, with the swing box to the specified weight and smoothing parts, moved to the pallet, stacking five storeys high;
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Clamp production<br>1. Take the operation instruction and put it in front of the tool table to confirm the mold condition;<br>2. Get the qualified mold to the machine platform;<br>3. Collect materials and place them in the feeding mechanism;<br>4. Turn on the power switch, set the molding speed (frequency), adjust the fixed length screw to set the feeding length and lock the screw;<br>5. The mold is fixed by the machine, and the material is introduced into the mold; (0.8-1.2m material removal head per plate)<br>6. The parts produced in the whole process of inching adjustment test mold, cutting knife, forming knife and inching are qualified by self inspection;<br>7. Start the automatic forming switch to trial produce 100 parts, and conduct the first three inspections and heat treatment inspections respectively;<br>8. For mass production, use turnover box to connect and load parts to the specified weight and flatten parts, move them to tray, and stack them up to five layers;
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.