In view of the problem of insufficient space between two rolling stands in the renovation of the guide and guard at the finish rolling entrance of the 1780 hot rolling line of Meigang, the finite element analysis method was used to optimize the size of the equipment, and on the premise of ensuring the reliability of the equipment, the minimum on-site processing was carried out. After the improvement, the on-site practice verified the improvement effect.
正在翻译中..