A 480 meter RC drill program at the ‘Crossbow’ prospect is planned to be completed in the coming quarter. The target lies astride the Pinjin Shear which plays a role in control of the Anglo Saxon gold deposit and lies close to the small Coles open pit mined last year by the Trouser Legs Mining Joint Venture The objective of this programme is to follow up on a bonanza gold-in-soil grades of 391 ppm Au and 9.35 ppm Au.