Every day before the shift, the operator shall check whether there is any problem affecting the safety operation before putting on the scaffold, and start the operation only after the problem is eliminated and solved. If unsafe conditions and signs are found during the operation, the operation shall be stopped immediately for inspection, and normal operation can be resumed after the solution is solved; if abnormal and dangerous conditions are found, all personnel on the scaffold shall be informed to evacuate immediately.
正在翻译中..