Third, rebar installation<br>1. Wall plate rebar construction<br>The horizontal rebar of the wall plate should not be too long, in order to benefit the steel bar tie, when the steel bar bending fishing should be towards the concrete, vertical rebar lifting position and length requirements should be carried out in accordance with the design requirements and specifications. Wall ribs should be tied point by point, two rows of steel between the pull hook, pull hook should hook the outerest rib, and make 45 degrees or 135 degrees hook, pull hook according to the design requirements of the spacing arrangement, a plum-shaped arrangement.
正在翻译中..