1.水泥稳定碎石接缝采用湿接缝,就是指前幅摊铺的混合料在靠近接缝边缘向里留出30~50cm不作碾压,待该部分混合料在其初凝之前与后幅新摊铺的的英语翻译

1.水泥稳定碎石接缝采用湿接缝,就是指前幅摊铺的混合料在靠近接缝边缘向

1.水泥稳定碎石接缝采用湿接缝,就是指前幅摊铺的混合料在靠近接缝边缘向里留出30~50cm不作碾压,待该部分混合料在其初凝之前与后幅新摊铺的混合料一并碾压密实,以保证前后两幅摊铺形成的施工缝质量。2.结合路面基层施工经验,采用梯状施工,前后两个作业面相距50米。两幅并行摊铺所形成的纵向湿缝处理方法为:第一幅靠近接缝的一边30~50cm范围内摊铺时不作碾压,等第二幅摊铺到时一并进行压实,接缝碾压时要注意多压几遍,局部表面粗糙处要筛细料进行补面,如遇大风和炎热天气,第一幅未碾压的部分要用塑料布进行覆盖,以防止水份过量蒸发。横向施工湿缝的处理类似纵缝,先期摊铺段亦预留30~50cm不作碾压,等下一次摊铺时一并碾压。纵向湿接缝处理方法见“图3 纵向湿接缝处理示意图”。3.横向施工缝的处理:应采用垂直平接。方法有二:其一是前一天摊铺的混合料端部已被碾压成斜坡状,待第二天摊铺时,在坡顶处用切割机切齐,将混合料铲除,重新摊铺新的混合料;其二是前一天摊铺到末端时,用与碾压成型厚度相同的方木顶放在接头处,压路机全部碾压,待第二天施工时将方木去掉,在接缝处洒水润湿,再摊铺新的混合料。摊铺接头完成后,派专人负责将接头处混合料中的大颗粒剔除,用细的混合料填充,保证接头的平整及顺接。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
1. wet cement stabilized gravel joint seams, refers to the mixture before the web paving aside inwardly near the edge of the seam 30 ~ 50cm is not rolling, the portion to be before it mixes with the initial setting mix paving new web dense compacted together, in order to ensure the quality of the construction joints formed by the front and rear two paving. <br>2. The binding road base construction experience, using the stepped construction, two front work surface 50 meters apart. Wet two longitudinal slits parallel processing method for the paving is formed: the first one is not close to the rolling within a range of 30 ~ 50cm side seam paving, paving and the like to the second web together compaction, then when multiple seam to be noted that rolling pressure several times, for a local surface roughness at the surface of fine sieve material for fill, such as windy and hot weather, the first part of a non-compacted plastic sheeting covering use, in order to prevent excess moisture evaporation. Wet process transverse seam construction similar longitudinal seam, is also reserved in advance paving segment 30 ~ 50cm is not rolling, rolling together the next time and the like paving. Longitudinal seams wet processing method, see "wet seaming 3 longitudinal schematic view." <br>3. The construction joints transverse process: should be butting vertical. There are two methods: one is an end portion of the day before the mix paving has been rolled into a ramp, until the next day when the paving at the top of the hill with a cutter cut flush, eradicate the mixture, re-paving the new mixture; the other is the end of the day before the paving, and grinding with the same thickness formed on top of lumber joints, all the rolling roller to be removed the next day, the construction lumber, in contact wetting sprinkler joints, then the new paving mix. After completion of paving joint, people accountable remove large particles mix at the joint, and filled with a fine mix to ensure the formation and linker, linking.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
1. Cement stable gravel seam using wet seams, that is, refers to the front paving of the mixture in close to the edge of the seam to set aside 30 to 50 cm without crushing, until the part of the mixture before its initial coagulation and the rear of the new paving mixture together with the compact, to ensure the front and rear two paving formation of the construction seam quality.<br>2. Combined with the experience of the grass-roots construction of the road surface, the use of ladder construction, before and after the two working surfaces are 50 meters apart. The vertical wet seam treatment method formed by the two parallel paving is: the first one near the seam side of the 30 to 50cm range of paving without crushing, such as the second paving to one time and compaction, seam crushing should pay attention to a few times, local surface rough to sieve fine material to make up, such as wind and hot weather, The first uncrushed part is covered with plastic sheeting to prevent excessive evaporation of water. The treatment of horizontal construction wet seams is similar to the vertical seams, the pre-paving section is also reserved for 30 to 50 cm not to be crushed, and so on the next paving time and crush. The longitudinal wet seam treatment method is shown in Figure 3 longitudinal wet seam treatment schematic.<br>3. Treatment of horizontal construction seams: vertical flat connection should be used. Methods are two: first, the previous day paved mixture end has been crushed into a slope-like, until the next day paving, at the top of the slope with a cutting machine to cut, the mixture will be eliminated, re-paved new mixture; To the next day of construction will remove the square wood, at the seams sprinkled with water wetting, and then spread new mixture. After the paving joint is completed, send a person responsible for removing the large particles in the mixture at the joint, filling with fine mixture to ensure that the joint is smooth and connected.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
1. Wet joint is adopted for cement stabilized macadam joint, which means that 30-50cm of the mixture paved in front of the joint edge shall not be rolled in, until this part of mixture is compacted together with the mixture newly paved in the back before its initial setting, so as to ensure the quality of construction joint formed by the two pavements.<br>2. Based on the construction experience of the pavement base, the ladder construction is adopted, and the distance between the two working surfaces is 50m. The treatment method of longitudinal wet joint formed by two parallel pavements is as follows: the first one is close to the joint within 30-50cm, no rolling is required when paving, and the second one is to be compacted when paving. When rolling the joint, pay attention to several times of rolling, and screen fine materials for patching at the rough part of the surface. In case of strong wind and hot weather, the first part not rolled shall be covered with plastic cloth To prevent excessive evaporation of water. The treatment of transverse construction wet joint is similar to that of longitudinal joint, and 30-50cm is reserved in the early paving section without rolling, and rolling shall be carried out at the next paving. See "Fig. 3 Schematic diagram of longitudinal wet joint treatment" for the treatment method of longitudinal wet joint.<br>3. Treatment of transverse construction joint: vertical flat joint shall be adopted. There are two methods: one is that the end of the mixture paved the previous day has been rolled into a slope shape, and when paving the next day, the cutting machine is used at the top of the slope to cut out the mixture and pave the new mixture again; the other is that when paving to the end of the previous day, the square wood with the same thickness as the rolling forming is used at the joint, and the roller is used to roll all the mixture, and the square wood will be removed when construction is carried out the next day Drop, wet the joint with water, and then spread new mixture. After the joint is paved, a special person shall be assigned to remove the large particles in the mixture at the joint and fill them with fine mixture to ensure the smoothness and smooth connection of the joint.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.