1. wet cement stabilized gravel joint seams, refers to the mixture before the web paving aside inwardly near the edge of the seam 30 ~ 50cm is not rolling, the portion to be before it mixes with the initial setting mix paving new web dense compacted together, in order to ensure the quality of the construction joints formed by the front and rear two paving. <br>2. The binding road base construction experience, using the stepped construction, two front work surface 50 meters apart. Wet two longitudinal slits parallel processing method for the paving is formed: the first one is not close to the rolling within a range of 30 ~ 50cm side seam paving, paving and the like to the second web together compaction, then when multiple seam to be noted that rolling pressure several times, for a local surface roughness at the surface of fine sieve material for fill, such as windy and hot weather, the first part of a non-compacted plastic sheeting covering use, in order to prevent excess moisture evaporation. Wet process transverse seam construction similar longitudinal seam, is also reserved in advance paving segment 30 ~ 50cm is not rolling, rolling together the next time and the like paving. Longitudinal seams wet processing method, see "wet seaming 3 longitudinal schematic view." <br>3. The construction joints transverse process: should be butting vertical. There are two methods: one is an end portion of the day before the mix paving has been rolled into a ramp, until the next day when the paving at the top of the hill with a cutter cut flush, eradicate the mixture, re-paving the new mixture; the other is the end of the day before the paving, and grinding with the same thickness formed on top of lumber joints, all the rolling roller to be removed the next day, the construction lumber, in contact wetting sprinkler joints, then the new paving mix. After completion of paving joint, people accountable remove large particles mix at the joint, and filled with a fine mix to ensure the formation and linker, linking.
正在翻译中..