JWG Series Particle Tester Installation Confirmation (IQ Verification)<br><br>This confirmation sheet applies to initial installation and equipment relocation.<br><br>What to install:<br>Ordinal Number Installation Requirements/Methods Installation Notes<br>1 Instrument installation environment requires relatively stable air flow and low air dust content <br> Stay away from sources of electromagnetic interference, vibration sources <br>2 Instrument power requirements AC220V x 10% <br> Reliable, separate ground <br> Power cord installation <br>3 Instruments<br>and accessories, whether the instrument packaging and appearance is in tact <br> Check that the instrument accessories are complete <br>4 Sampler<br>Installation Sampler Mounted on The Sample pump <br>5 Drain tubes<br>Installation Connect the drain tube to the drain ingress on the drain ingres son of the rear panel of the instrument <br>6 Printer<br>Install the printer and connect the instrument <br> Printer feed installation <br>7 its it <br> <br>Instrument installation validator: installation date:
正在翻译中..