Gauges are available on-site with the appropriate capability (e.g., appropriate gauge, measurement method and datum point) to meet the measurement requirements of the control plan. In exceptional circumstances, if measurement capability is not available on-site, the supplier has a defined strategy for using a third party for this item, including timing and availability.