Before the construction of engineering pile, the test pile shall be carried out to determine the feasibility of pile forming and the bearing capacity of single pile. Under the same condition, the total number of test piles shall not be less than 1% of the total number of piles, and not less than 3 piles.<br>
正在翻译中..