1、 Project experience - OEE improvement<BR>Project background: due to the increase of the company's production capacity, the existing injection molding machine OEE can not meet the production capacity requirements, and limited by the matching assembly line, it is urgent to improve the OEE<BR>Project objective: improve injection molding machine OEE by 3% - 5%<BR>Project members: Technology Department, quality department, machine repair department, production department, etc<BR>1. Measure and evaluate the maximum production capacity of each station and robot in the assembly line<BR>2. Evaluate the potential bottleneck position or bottleneck robot of different products<BR>3. Cooperate with the machine repair and Technology Department to shorten the operation beat time of each robot and improve the production capacity<BR>4. Carry out special skill training for employees in bottleneck stations to improve their proficiency and operation methods, so as to improve production capacity<BR>5. Evaluate the increase and decrease of stations and robots, and optimize the assembly line layout<BR>6. Hold regular meetings to evaluate improvement plans<BR>7. Determine improvement plan and implement assembly line transformation<BR>Responsibility description:<BR>Lead improvement activities, propose improvement actions, participate in the transformation of the assembly line, test and trial production with other departments. Finally get the test data, complete the test report and complete the improvement work.
正在翻译中..