Fixture Buy Off 4.4.1 Supplier shall include the following prior to buy-off; • Certification report with raw data. • Final Work Instructions, with clear usage instructions. • Proper storage capability to prevent lost or damaged components. • Gauge GR&R report with raw data. • Final CAD with updated tooling bushing locations, and any changes realized during construction. 4.4.2 All documentation must be submitted in an electronic format. 4.4.3 A copy of the work instructions, all certifications and GR&R results must be printed, bound and affixed to the gauge in a sealed, weather-proof envelope.