Since the installation of lighting in reservoir is completed, it is currently ready to connect the power supply. The power supply is from the CCA siphon pump room-QC.VCP distribution cabinet. The cable needs to be connected from the bottom of distribution cabinet. After discussed, in consideration of safety issues, it is necessary to stop the circuit breaker switch CAS7, CAS8 and its upstream feeder power supply (see attached picture). The connection is planned to start on 6-July-2020. Please help to coordinate. Thank you.