4)Once the Solvent Drum level transmitter, LT-24187 shows sufficient level, commission P-2410 A/S Solvent Pump following vendor recommendations and begin pumping the cumene from the Solvent Drum into the bottom of the OEC through FV-24178. Ensure that sufficient level is maintained to prevent the Solvent Pump from running dry.