Because before the start of high-rise building construction, the application of aluminum formwork has been pretreated, so in the actual construction process, it can be directly applied without any specific treatment, which not only improves the comprehensive utilization rate of materials, but also reduces the amount of waste. In addition, the local damaged or abandoned aluminum formwork can be recycled and put into use again after transformation, which can effectively control the cost loss<br>
正在翻译中..